Our Projects

Here are some of the installations we have set up for clients across different sectors. The quality of our solutions is measured in concrete results.

Panificio Tossini S.p.A. – Liguria, Italy

Bakery products manufacturing industry

Requirement

Discharge into the sewage system compliant with local regulations of the Liguria region.

Year: 2018

Solution

Chemical-physical treatment with flotation + sludge dewatering system.

Key data: 30 m³/day of treated water. Fat removal from 95 to 99%. Adaptability to available on-site space. COD reduction > 80%.

Operti Fratelli Snc – Cuneo, Italy

Cattle Slaughterhouse

Requirement

Treatment of washing water from slaughterhouse premises.

Year: 1999, with upgrades in 2007 and 2015

Solution

Coarse and fine screening + primary settling. Equalisation tank + SBR biological treatment plant. Automatic sampler active 24/7 on the discharge. Sludge treatment line with centrifuge.

Key data: 350 m³/day. Several improvements made over time to accommodate the increased production capacity of the slaughterhouse. Removal > 90% for BOD, COD and total nitrogen.

Tannery in Cuneo (Hermès Group)

Alligator skin treatment and processing industry

Requirement

Reduction of COD, heavy metals and chromium from alligator skin tanning.

Year: 2017

Solution

Coarse and fine screening, equalisation tank, chemical-physical pre-treatment with settling, biological treatment, secondary settling, final discharge.

Key data: 60 m³/day. Very high chromium reduction (output values equal to 1/5 of the legal limit). BOD output < 10 mg/L. One of our technicians on site 5 days a week for full plant management.

Tannery in Cuneo (Hermès Group)

Leather treatment and processing industry

Requirement

Reduction of surfactants (500 mg/L inlet concentration).

Year: 2025

Solution

Separation of tanning baths rich in surfactants, equalisation tank, Fenton-type treatment.

Key data: Batch treatments of 5 m³ each, with the possibility of running multiple cycles per day. Surfactant reduction: 90–95%.

Bitron Spa

Automotive components manufacturing industry

Requirement

Wastewater treatment (grey and black water).

Year: 2012

Solution

Dedicated grease trap for the canteen only, Imhoff tank, aerated trickling filter.

Key data: 12 m³/day | Discharge into a surface watercourse. Fully underground plant to improve space utilisation.

Prefabbricati Guerrini Spa

Reinforced concrete elements manufacturing

Requirement

Solids removal and pH correction.

Year: 2023

Solution

Settling, two-stage pH correction (automatic), hydrocarbon and surfactant removal via activated carbon filter.

Key data: 25 m³/day | High solids content. Remote connection via PLC. Solids removal > 95%.

Imerys Talc Spa

Talc mine

Requirement

Solids reduction and pH correction.

Year: 2015

Solution

Renovation of an existing plant with the addition of a mixer and a hydrocarbon extraction compartment.

Key data: 20 m³/day | Continuous monitoring of outlet pH.

Salumificio Viviano Srl – Venasca

Pork slaughterhouse and cured meat production

Requirement

Elimination of a high pollutant load, in particular ammoniacal nitrogen.

Year: 2022

Solution

Static grease trap, rotary drum screen, SBR biological treatment plant.

Key data: 10 m³/day | Ammoniacal nitrogen reduction > 95%. COD and BOD reduction > 90%.

Beppino Occelli I Formaggi Srl – Farigliano

Cheese production

Requirement

Well water treatment for plant utilities.

Year: 2017

Solution

Supply and commissioning of a potabilisation plant for the production facility (primary chlorination, quartzite filtration, dechlorination on activated carbon, secondary chlorination, softening).

Key data: potabilisation flow rate 16 m³/h.

Casa di cura Sant'Anna Spa – Asti

Healthcare facility, private and NHS-accredited inpatient care

Requirement

Preventive treatment for controlling Legionella spp proliferation in the domestic hot water distribution network.

Year: 2016

Solution

Supply, installation and commissioning of systems for the proportional dosing of biocidal and anticorrosive products.

Key data: Legionellosis risk prevention.

Meco Sauze Srl – Sauze d'Oulx

District heating

Requirement

Pre-treatment of network make-up water and conditioning.

Year: 2024

Solution

Supply and installation of a water softener, dosing systems and chemicals with anticorrosive and dispersing action.

Key data: make-up water hardness 34°F, circuit volume 800 m³.

Roboplast Srl – Vignolo

Plastic material production by extrusion, thermoforming of plastic containers

Requirement

Well water softening for make-up of evaporative cooling towers and industrial purposes.

Year: 2023

Solution

Supply, installation and commissioning of a duplex softener with a softening flow rate of 14,000 l/h.

Key data: well water, hardness 35°F, flow rate 10,000 – 12,000 l/h.

VM Marketing Srl – Savigliano

Commercial company specialised in the export of apples, peaches and nectarines

Requirement

Softening, conditioning and automatic blowdown management (via conductivity reading) of the make-up/circuit water for evaporative condensers.

Year: 2019–2021

Solution

Supply, installation and commissioning of a softening system and a proportional dosing system for the in-line injection of an anticorrosive/antiscale product. Automatic blowdown management via a conductivity controller for recirculating water.

Key data: make-up flow rate 2,500 l/h, make-up water conductivity 800 µS, hardness >35°F.